SONAM development project (Nigeria)

SONAM development project (Nigeria)

FEED Verification and Detail Design of a 32km new 20” bulk flow pipeline from Sonam NWP field to the new Okan Pig receiver platform (PRP).

SONAM pipeline scope includes installation of the following:

  • 30KM bulk flow pipeline 20” ID from SONAM NWP to Okan PRP
  • A 20” Expansion loop near Sonam NWP
  • 2 X 20” risers one at SONAM NWP and the other at Okan PRP

Client: Basis Engineering S.r.l. / Chevron Nigeria Limited

Awarded in September 2014 – Completed in February 2015

  • 13.05.2015
  • |
  • 16.40
Find out more about our sustainable path in line with the Sustainable Development Goals of the UN 2030 Agenda